Matching & Scoring Guide

How the platform decides which contractors qualify for a request (matching, the Project Fit %) and how good a contractor is (the Property Care Score /100 and the Platinum / Gold / Silver tier). Both numbers are computed by the system from evidence on record; nobody types them. This guide is for the administrator and coordinator who have to explain a number, tune a weight, or override a result, and it is written so a building manager or contractor can read it too.

1. Two numbers, two questions

NumberAnswersScaleWhere it shows
Project Fit %Is this contractor right for this request?0–100 per contractor per requestMatch table on the building manager's request page, the contractor's Project Opportunities ("Match Score"), the project's Matches tab in the back office
Property Care ScoreHow does this contractor perform in general?0–100 per contractorContractor dashboard and Performance page, the contractor record, the Admin Dashboard's top performers, and 10% of every Project Fit

The score feeds the fit, not the other way round. A contractor's score is recomputed whenever their history changes; a request's matches are recomputed whenever the request or the network changes.

2. Matching — the Project Fit

2.1 Who is considered

Only contractors that are accredited, current and switched on enter the calculation, and only if their trades overlap the request's specialization: the exact trade, or any trade in the same PT trade group when the group-widening switch is on (default on). A contractor with no overlap at all is not a candidate and does not appear in the register even as an exclusion.

2.2 The eight criteria

Each criterion scores 0–100. The fit is the weighted mean. Default weights sum to 100 and are editable in Platform Settings.

#CriterionWeightHow it is scored
1Specialty match25Accredited for the exact trade = 100. Same PT group only = 60 (setting).
2Relevant experience15Completed network projects in this trade plus half a point per verified portfolio entry; five units = 100.
3Project value fit15Project value ÷ the contractor's accredited capacity limit: ≤ 0.8 → 100, ≤ 1.0 → 85, ≤ 1.25 → 55, ≤ 2.0 → 25, above → 0. No limit set but the contractor declared a typical project value (2026-10-05): same budget band as the request → 100, one band off → 70, further → 40 — a fallback only, the staff-set limit always wins. Otherwise either figure missing → 60.
4Location10Same city as the property = 100; the request's region is inside the contractor's declared geographic coverage, or they declared Nationwide = 85; same region as their office = 70 (NCR, Rizal, Laguna, Cavite, Bulacan, Batangas, Pampanga, Benguet, Cebu, Iloilo, Negros Occidental, Davao, Misamis Oriental — the city map is editable); either city unknown = 60; elsewhere = 40.
5Available capacity10With a capacity limit: (open awarded value + this project) ÷ limit: ≤ 0.5 → 100, ≤ 0.8 → 80, ≤ 1.0 → 55, ≤ 1.5 → 25, above → 0. Without a limit: 0–2 running projects = 90, 3–4 = 60, more = 30.
6Accreditation standing10Platinum 100, Gold 85, Silver 70; minus 10 if documents are Expiring, minus 40 if Lapsed.
7Past performance10The Property Care Score itself. A contractor with no score yet is held at the network average.
8Availability5Starts at 100. Suspended −60; under performance review −25; each invitation left unanswered for more than 90 days (setting) −15 (max −30); each overdue milestone −10 (max −30); the contractor's declared current workload (2026-10-05) — available now 0, within 30 days −10, limited −25, fully booked −50 — counted only while confirmed in the last 90 days.

The project value is the approved budget, else the estimated cost, else the midpoint of the budget band (₱250K, ₱750K, ₱3M, ₱7.5M, ₱15M). The project city is the property's, else the client's, else the location text.

2.3 What the register holds

Every scored contractor gets one row per request in Procurement → Matches (also the project's Matches tab):

ColumnMeaning
Project Fit %The weighted mean above.
RankPosition among qualified contractors, fit descending, ties by contractor id so two runs never shuffle.
StatusProposed (qualified), Shortlisted (a coordinator's mark, kept across recomputes while the contractor still qualifies), Invited (an invitation exists), Excluded (below the fit floor, or excluded by staff).
Why you're matchedEvery criterion at or above 75 (setting), as a sentence. This is the tick list the contractor sees.
Excluded reasonFor excluded rows: the criteria below 50 with their notes, or the staff reason.
Score breakdownJSON with score, weight and a one-line note per criterion. This is the calculation an auditor reads.

A contractor qualifies when the fit is at least the minimum fit (default 40). The request's MatchCount is the number of qualified rows; the promise is at least 3 (setting).

2.4 When matching runs

A recompute replaces the register with the current truth. Two things survive: a row someone has Invited keeps that status, and a staff exclusion stays excluded (section 2.6). Everything else is rewritten from the score, and rows for contractors who no longer overlap the trade are dropped.

2.5 The shortfall

If fewer than the promised three qualify, the request stays in Matching, the project is flagged, and a Critical alert "Project has fewer than 3 qualified bidders" appears on the Admin Dashboard under Items Requiring Action. The building manager's request page says "Property Care is still identifying contractors". The alert resolves itself the moment a recompute finds three. Ways to close a gap: accredit a contractor in that trade, switch on group widening, lower the minimum fit for that category's reality, or invite by hand with Invite One.

2.6 Human overrides

2.7 What the contractor sees

By default the contractor's Project Opportunities lists only the tenders they are invited to, with their Match Score. Only when the Platform Settings switch contractor portal shows matches before invitation is on (it is off by default) does it also list open tenders where they are Proposed or Shortlisted and not yet invited, marked Matched · awaiting invitation, best fit first, with "Why you're matched" and their rank. The client is shown as Property Care Network Client until the contractor accepts an invitation (setting). Excluded rows and the fit of other contractors are never shown to them.

3. The Property Care Score

3.1 The eight components

ComponentWeightRaw metricCounts as evidence
Client rating25Average of every evaluation's overall score, 0–5, ×20Number of evaluations
Project success20Completed and accepted projects with no open critical issue ÷ projects awardedProjects awarded
Bid win rate15Awarded ÷ submitted bidsBids submitted
Shortlist rate10Shortlisted or awarded ÷ submitted bidsBids submitted
Relevant experience10Verified engagements (network projects completed plus verified portfolio entries), 10 = full marks (setting)Not shrunk
On-time completion10Milestones completed on or before their due date ÷ milestones completedMilestones completed
Compliance5Mandatory documents verified and current ÷ mandatory documentsNot shrunk
Responsiveness5Invitations answered within the response window (72 hours, setting) ÷ invitationsInvitations

Weights are editable in Platform Settings and default to the client's guide. Repeat client rate (clients who awarded the contractor twice ÷ clients who awarded once) is shown on dashboards but is not a score component.

3.2 Volume normalisation

A contractor with two bids and one win does not have a 50% win rate worth 15 points. Every rate component is pulled toward the network mean with a prior of 5 virtual observations (setting):


normalised = (n × rate + 5 × network mean) ÷ (n + 5)

With no observations the component is exactly the network mean; with fifty it is almost entirely the contractor's own. The network mean per component is the average over accredited contractors that have at least one observation, and 70 when nobody has any. Experience and Compliance are facts about today, so they are not shrunk.

The score is the weighted mean of the eight normalised components. The stored breakdown keeps, per component: raw metric, observations, un-shrunk score, normalised score, weight and contribution. It is shown on the contractor's Performance page ("How the score is calculated") and on the contractor record's Score History tab (monthly snapshots with the calculation).

3.3 Tiers

TierScore
Platinum90 and above (setting)
Gold75 and above (setting)
SilverEvery other accredited contractor

The tier moves automatically when the score crosses a band and the move is written to the contractor's log. Set Tier on the contractor record overrides it (and sets the capacity limit); an overridden tier is marked and left alone by the engine until the override is cleared. The tier is the medal on the contractor's dashboard, the badge on the match table, 10% of every fit, and the capacity assumption at award.

3.4 Strengths and opportunities

Generated by rule from the breakdown, so they cannot contradict the score above them: a component at 85 or above with at least one observation becomes a strength sentence; at 60 or below an improvement sentence; compliance under 100 always adds "Increase documentation completeness". Thresholds are settings.

3.5 Profile completeness

Shown on the contractor's Accreditation page. Weighted parts: eleven profile fields (3 each), logo (6), primary specialization (6), at least one portfolio entry (6), the required verified references (8), key officers on record (8), and mandatory documents verified (20, pro rata). It does not enter the score; it tells the contractor what the network still lacks about them.

3.6 When the score recomputes

Before each recompute the contractor's counters (bids, wins, shortlists, documents, compliance) are refreshed, so the score is never computed on a stale denominator. A fall of 10 points or more against the previous computation raises an Action alert "Contractor performance score has dropped" for the administrator; it clears when the score recovers.

There is no manual "recompute score" button. Recompute Standing on the contractor record refreshes documents and compliance only; the nightly tick (or the next evaluation, award or response) picks the change up.

3.7 How an evaluation becomes the client rating

An evaluation — the client's from their portal after acceptance, or Property Care's from the project's Delivery tab — scores seven criteria from 1 to 5: quality, timeliness, communication, professionalism, problem resolution, safety and cost control. Its overall score is their weighted mean (25 / 20 / 15 / 10 / 10 / 10 / 10 by default; a criterion left blank is simply left out), and it carries a would rehire answer and free comments. The client's overall score is also stored on the project as its client satisfaction. Client rating in the score above is the plain average of every evaluation's overall score, scaled to 100, with the number of evaluations as its evidence — so a single glowing review from one project is pulled toward the network mean like any other thin record, and a contractor's rating is the whole of their history, not the last job. A client who has not evaluated a week after acceptance is reminded once by e-mail.

4. Settings

On Setup → Platform Settings:

SettingDefaultEffect
Qualified contractors promised per request3Shortfall threshold; also the "Avg. Time to 3 Matches" KPI
Minimum fit % to count as a match40Below this the row is Excluded
Matching weights (JSON)blank = 25/15/15/10/10/10/10/5{"Specialty":25,"Experience":15,"ProjectValue":15,"Location":10,"Capacity":10,"Accreditation":10,"Performance":10,"Availability":5}
Property Care Score weights (JSON)blank = 25/20/15/10/10/10/5/5{"ClientRating":25,"ProjectSuccess":20,"BidWinRate":15,"ShortlistRate":10,"Experience":10,"OnTime":10,"Compliance":5,"Responsiveness":5}
Tier bands (JSON){"PLATINUM":90,"GOLD":75}Score floors
Responsiveness window (hours)72Answered inside it counts as responsive
Building managers may invite matchesYes"Invite to Bid" on the client's match table
Reveal the client on acceptanceYesAnonymised label until the invitation is accepted
Anonymised client labelProperty Care Network Client

The finer controls are on the same page: whether matching widens to sibling specialties of the same trade group (yes) and the score given for such a match (60), the score at which a criterion becomes a "why you're matched" reason (75), how long an invitation may go unanswered before it counts against availability (90 days), the city-to-region map, the evaluation criteria weights, the verified engagements that earn full experience marks (10), the score's evidence prior (5), the strength and improvement thresholds (85 and 60) and the score drop alert (10 points). A declared workload counts for 90 days; that one is fixed. A settings change applies to the next computation: press Run Matching on a request, or wait for the tick.

5. Reading a number in front of a client

  1. "Why is this contractor 93% and that one 78%?" Open the project's Matches tab, open the row, read the breakdown: eight lines, each with a score, a weight and a plain sentence. The gap is usually experience in the trade or location.
  2. "Why only two matches?" The register shows the excluded rows with their reasons. Either nobody else carries the trade (recruit, or widen the group) or the others fell below the fit floor (read which criterion).
  3. "Why did a new contractor score 71 with no projects?" Shrinkage: every rate component sits at the network mean until there is evidence. That is deliberate; it prevents a first lucky win producing a Platinum.
  4. "Why did the score drop this month?" Score History shows the snapshot before and after; compare the two breakdowns component by component. A dropped tier is in the contractor's log with the score that moved it.
  5. "Can we just rank this contractor higher?" Not the score. Shortlist them on the request, invite them, or set a tier override with a note. All three are logged, none change the calculation.