How the platform decides which contractors qualify for a request (matching, the Project Fit %) and how good a contractor is (the Property Care Score /100 and the Platinum / Gold / Silver tier). Both numbers are computed by the system from evidence on record; nobody types them. This guide is for the administrator and coordinator who have to explain a number, tune a weight, or override a result, and it is written so a building manager or contractor can read it too.
1. Two numbers, two questions
| Number | Answers | Scale | Where it shows |
|---|---|---|---|
| Project Fit % | Is this contractor right for this request? | 0–100 per contractor per request | Match table on the building manager's request page, the contractor's Project Opportunities ("Match Score"), the project's Matches tab in the back office |
| Property Care Score | How does this contractor perform in general? | 0–100 per contractor | Contractor dashboard and Performance page, the contractor record, the Admin Dashboard's top performers, and 10% of every Project Fit |
The score feeds the fit, not the other way round. A contractor's score is recomputed whenever their history changes; a request's matches are recomputed whenever the request or the network changes.
2. Matching — the Project Fit
2.1 Who is considered
Only contractors that are accredited, current and switched on enter the calculation, and only if their trades overlap the request's specialization: the exact trade, or any trade in the same PT trade group when the group-widening switch is on (default on). A contractor with no overlap at all is not a candidate and does not appear in the register even as an exclusion.
2.2 The eight criteria
Each criterion scores 0–100. The fit is the weighted mean. Default weights sum to 100 and are editable in Platform Settings.
| # | Criterion | Weight | How it is scored |
|---|---|---|---|
| 1 | Specialty match | 25 | Accredited for the exact trade = 100. Same PT group only = 60 (setting). |
| 2 | Relevant experience | 15 | Completed network projects in this trade plus half a point per verified portfolio entry; five units = 100. |
| 3 | Project value fit | 15 | Project value ÷ the contractor's accredited capacity limit: ≤ 0.8 → 100, ≤ 1.0 → 85, ≤ 1.25 → 55, ≤ 2.0 → 25, above → 0. No limit set but the contractor declared a typical project value (2026-10-05): same budget band as the request → 100, one band off → 70, further → 40 — a fallback only, the staff-set limit always wins. Otherwise either figure missing → 60. |
| 4 | Location | 10 | Same city as the property = 100; the request's region is inside the contractor's declared geographic coverage, or they declared Nationwide = 85; same region as their office = 70 (NCR, Rizal, Laguna, Cavite, Bulacan, Batangas, Pampanga, Benguet, Cebu, Iloilo, Negros Occidental, Davao, Misamis Oriental — the city map is editable); either city unknown = 60; elsewhere = 40. |
| 5 | Available capacity | 10 | With a capacity limit: (open awarded value + this project) ÷ limit: ≤ 0.5 → 100, ≤ 0.8 → 80, ≤ 1.0 → 55, ≤ 1.5 → 25, above → 0. Without a limit: 0–2 running projects = 90, 3–4 = 60, more = 30. |
| 6 | Accreditation standing | 10 | Platinum 100, Gold 85, Silver 70; minus 10 if documents are Expiring, minus 40 if Lapsed. |
| 7 | Past performance | 10 | The Property Care Score itself. A contractor with no score yet is held at the network average. |
| 8 | Availability | 5 | Starts at 100. Suspended −60; under performance review −25; each invitation left unanswered for more than 90 days (setting) −15 (max −30); each overdue milestone −10 (max −30); the contractor's declared current workload (2026-10-05) — available now 0, within 30 days −10, limited −25, fully booked −50 — counted only while confirmed in the last 90 days. |
The project value is the approved budget, else the estimated cost, else the midpoint of the budget band (₱250K, ₱750K, ₱3M, ₱7.5M, ₱15M). The project city is the property's, else the client's, else the location text.
2.3 What the register holds
Every scored contractor gets one row per request in Procurement → Matches (also the project's Matches tab):
| Column | Meaning |
|---|---|
| Project Fit % | The weighted mean above. |
| Rank | Position among qualified contractors, fit descending, ties by contractor id so two runs never shuffle. |
| Status | Proposed (qualified), Shortlisted (a coordinator's mark, kept across recomputes while the contractor still qualifies), Invited (an invitation exists), Excluded (below the fit floor, or excluded by staff). |
| Why you're matched | Every criterion at or above 75 (setting), as a sentence. This is the tick list the contractor sees. |
| Excluded reason | For excluded rows: the criteria below 50 with their notes, or the staff reason. |
| Score breakdown | JSON with score, weight and a one-line note per criterion. This is the calculation an auditor reads. |
A contractor qualifies when the fit is at least the minimum fit (default 40). The request's MatchCount is the number of qualified rows; the promise is at least 3 (setting).
2.4 When matching runs
- The moment a building manager submits a request.
- Run Matching on the project record (SUBMITTED / DRAFT → MATCHING). The message reports "N/3 qualified" or the shortfall.
- Nightly, for every request that is Submitted, Matching, Invited or Open for Bids.
- Invite Top Matches computes first if the register is empty.
A recompute replaces the register with the current truth. Two things survive: a row someone has Invited keeps that status, and a staff exclusion stays excluded (section 2.6). Everything else is rewritten from the score, and rows for contractors who no longer overlap the trade are dropped.
2.5 The shortfall
If fewer than the promised three qualify, the request stays in Matching, the project is flagged, and a Critical alert "Project has fewer than 3 qualified bidders" appears on the Admin Dashboard under Items Requiring Action. The building manager's request page says "Property Care is still identifying contractors". The alert resolves itself the moment a recompute finds three. Ways to close a gap: accredit a contractor in that trade, switch on group widening, lower the minimum fit for that category's reality, or invite by hand with Invite One.
2.6 Human overrides
- Invite to Bid on a match row (or on the building manager's match table when their installation allows it) creates the invitation, marks the row Invited, and moves a Matching request to Invited. Allowed while the request is Matching, Invited or Open for Bids.
- Exclude on a match row takes a Proposed or Shortlisted contractor out of this request for a stated reason (conflict of interest, client objection, a known capacity problem). The reason is recorded on the row and in the project log, the survivors are re-ranked, MatchCount and the shortfall alert are refreshed, and the nightly rematch respects the exclusion. An invited contractor cannot be excluded here; withdraw the invitation instead.
- Invite Top Matches invites the best N qualified, uninvited contractors in one step.
- Invite Matched Contractors and Invite One are the older bulk and by-code invitations; both still work and both mark the matching rows Invited.
2.7 What the contractor sees
By default the contractor's Project Opportunities lists only the tenders they are invited to, with their Match Score. Only when the Platform Settings switch contractor portal shows matches before invitation is on (it is off by default) does it also list open tenders where they are Proposed or Shortlisted and not yet invited, marked Matched · awaiting invitation, best fit first, with "Why you're matched" and their rank. The client is shown as Property Care Network Client until the contractor accepts an invitation (setting). Excluded rows and the fit of other contractors are never shown to them.
3. The Property Care Score
3.1 The eight components
| Component | Weight | Raw metric | Counts as evidence |
|---|---|---|---|
| Client rating | 25 | Average of every evaluation's overall score, 0–5, ×20 | Number of evaluations |
| Project success | 20 | Completed and accepted projects with no open critical issue ÷ projects awarded | Projects awarded |
| Bid win rate | 15 | Awarded ÷ submitted bids | Bids submitted |
| Shortlist rate | 10 | Shortlisted or awarded ÷ submitted bids | Bids submitted |
| Relevant experience | 10 | Verified engagements (network projects completed plus verified portfolio entries), 10 = full marks (setting) | Not shrunk |
| On-time completion | 10 | Milestones completed on or before their due date ÷ milestones completed | Milestones completed |
| Compliance | 5 | Mandatory documents verified and current ÷ mandatory documents | Not shrunk |
| Responsiveness | 5 | Invitations answered within the response window (72 hours, setting) ÷ invitations | Invitations |
Weights are editable in Platform Settings and default to the client's guide. Repeat client rate (clients who awarded the contractor twice ÷ clients who awarded once) is shown on dashboards but is not a score component.
3.2 Volume normalisation
A contractor with two bids and one win does not have a 50% win rate worth 15 points. Every rate component is pulled toward the network mean with a prior of 5 virtual observations (setting):
normalised = (n × rate + 5 × network mean) ÷ (n + 5)
With no observations the component is exactly the network mean; with fifty it is almost entirely the contractor's own. The network mean per component is the average over accredited contractors that have at least one observation, and 70 when nobody has any. Experience and Compliance are facts about today, so they are not shrunk.
The score is the weighted mean of the eight normalised components. The stored breakdown keeps, per component: raw metric, observations, un-shrunk score, normalised score, weight and contribution. It is shown on the contractor's Performance page ("How the score is calculated") and on the contractor record's Score History tab (monthly snapshots with the calculation).
3.3 Tiers
| Tier | Score |
|---|---|
| Platinum | 90 and above (setting) |
| Gold | 75 and above (setting) |
| Silver | Every other accredited contractor |
The tier moves automatically when the score crosses a band and the move is written to the contractor's log. Set Tier on the contractor record overrides it (and sets the capacity limit); an overridden tier is marked and left alone by the engine until the override is cleared. The tier is the medal on the contractor's dashboard, the badge on the match table, 10% of every fit, and the capacity assumption at award.
3.4 Strengths and opportunities
Generated by rule from the breakdown, so they cannot contradict the score above them: a component at 85 or above with at least one observation becomes a strength sentence; at 60 or below an improvement sentence; compliance under 100 always adds "Increase documentation completeness". Thresholds are settings.
3.5 Profile completeness
Shown on the contractor's Accreditation page. Weighted parts: eleven profile fields (3 each), logo (6), primary specialization (6), at least one portfolio entry (6), the required verified references (8), key officers on record (8), and mandatory documents verified (20, pro rata). It does not enter the score; it tells the contractor what the network still lacks about them.
3.6 When the score recomputes
- After every evaluation (client or Property Care).
- After every award, for every contractor that bid on the project.
- After every invitation response (accept or decline).
- Nightly for the whole accredited network, with the network means computed once up front.
- A monthly snapshot on the first of the month, one row per contractor, for "vs last month" and the trend.
Before each recompute the contractor's counters (bids, wins, shortlists, documents, compliance) are refreshed, so the score is never computed on a stale denominator. A fall of 10 points or more against the previous computation raises an Action alert "Contractor performance score has dropped" for the administrator; it clears when the score recovers.
There is no manual "recompute score" button. Recompute Standing on the contractor record refreshes documents and compliance only; the nightly tick (or the next evaluation, award or response) picks the change up.
3.7 How an evaluation becomes the client rating
An evaluation — the client's from their portal after acceptance, or Property Care's from the project's Delivery tab — scores seven criteria from 1 to 5: quality, timeliness, communication, professionalism, problem resolution, safety and cost control. Its overall score is their weighted mean (25 / 20 / 15 / 10 / 10 / 10 / 10 by default; a criterion left blank is simply left out), and it carries a would rehire answer and free comments. The client's overall score is also stored on the project as its client satisfaction. Client rating in the score above is the plain average of every evaluation's overall score, scaled to 100, with the number of evaluations as its evidence — so a single glowing review from one project is pulled toward the network mean like any other thin record, and a contractor's rating is the whole of their history, not the last job. A client who has not evaluated a week after acceptance is reminded once by e-mail.
4. Settings
On Setup → Platform Settings:
| Setting | Default | Effect |
|---|---|---|
| Qualified contractors promised per request | 3 | Shortfall threshold; also the "Avg. Time to 3 Matches" KPI |
| Minimum fit % to count as a match | 40 | Below this the row is Excluded |
| Matching weights (JSON) | blank = 25/15/15/10/10/10/10/5 | {"Specialty":25,"Experience":15,"ProjectValue":15,"Location":10,"Capacity":10,"Accreditation":10,"Performance":10,"Availability":5} |
| Property Care Score weights (JSON) | blank = 25/20/15/10/10/10/5/5 | {"ClientRating":25,"ProjectSuccess":20,"BidWinRate":15,"ShortlistRate":10,"Experience":10,"OnTime":10,"Compliance":5,"Responsiveness":5} |
| Tier bands (JSON) | {"PLATINUM":90,"GOLD":75} | Score floors |
| Responsiveness window (hours) | 72 | Answered inside it counts as responsive |
| Building managers may invite matches | Yes | "Invite to Bid" on the client's match table |
| Reveal the client on acceptance | Yes | Anonymised label until the invitation is accepted |
| Anonymised client label | Property Care Network Client |
The finer controls are on the same page: whether matching widens to sibling specialties of the same trade group (yes) and the score given for such a match (60), the score at which a criterion becomes a "why you're matched" reason (75), how long an invitation may go unanswered before it counts against availability (90 days), the city-to-region map, the evaluation criteria weights, the verified engagements that earn full experience marks (10), the score's evidence prior (5), the strength and improvement thresholds (85 and 60) and the score drop alert (10 points). A declared workload counts for 90 days; that one is fixed. A settings change applies to the next computation: press Run Matching on a request, or wait for the tick.
5. Reading a number in front of a client
- "Why is this contractor 93% and that one 78%?" Open the project's Matches tab, open the row, read the breakdown: eight lines, each with a score, a weight and a plain sentence. The gap is usually experience in the trade or location.
- "Why only two matches?" The register shows the excluded rows with their reasons. Either nobody else carries the trade (recruit, or widen the group) or the others fell below the fit floor (read which criterion).
- "Why did a new contractor score 71 with no projects?" Shrinkage: every rate component sits at the network mean until there is evidence. That is deliberate; it prevents a first lucky win producing a Platinum.
- "Why did the score drop this month?" Score History shows the snapshot before and after; compare the two breakdowns component by component. A dropped tier is in the contractor's log with the score that moved it.
- "Can we just rank this contractor higher?" Not the score. Shortlist them on the request, invite them, or set a tier override with a note. All three are logged, none change the calculation.
6. Guarantees
- Deterministic. Same project and contractor rows produce the same numbers; ties break by id, never by luck.
- Stored, not recalculated on view. What the building manager saw when they awarded is what the register holds until the next recompute.
- Auditable. Every fit and every score carries its breakdown; every tier change, exclusion and invitation is in a log with who and when.
- Self-correcting. Alerts for shortfalls and score drops raise and resolve themselves from the same computation.